Lead Times

A Better Way to Deploy Power — On a Schedule You Can Plan Around

Capacity can’t wait on a six-month queue. NextGen RPP is structured for speed: standard NX Series configurations in stock now, a four-week build-to-spec standard, and emergency expedited recovery when a project slips. Domestic, vertically integrated manufacturing keeps your power on the critical path — never the constraint.

Start Your Project

In Stock

Standard Configs

Common NX Series RPP builds are on the shelf and ready to ship now.

4-Week

Build-to-Spec

Our standard lead time for configured, made-to-order panels.

Expedited

Emergency Recovery

Rush and recovery options when a schedule has already slipped.

Lineup of three NX Series Remote Power Panels ready to ship
Supporting Rapid Expansion

Power That Keeps Pace With Your Buildout

Data center and AI/hyperscale schedules move faster than traditional electrical lead times were ever built to support. We re-architected the supply model around that reality — stocking standard configurations, manufacturing domestically, and controlling the critical components in-house so a single long-lead part can’t hold your project hostage.

The result is power distribution you can actually plan around: predictable dates, transparent status, and the flexibility to compress when you need to.

  • Standard NX Series RPP configurations stocked and ship-ready
  • Four-week build-to-spec as the standard, not the exception
  • Emergency and expedited paths for recovery scenarios
  • Domestic, BABA-compliant manufacturing
Check Availability
Why We’re Fast

Three Structural Advantages, Not Promises

Speed at NextGen RPP isn’t a heroic exception — it’s designed into how we source, build, and ship.

In-Stock Supply

Standard NX Series RPP configurations are built ahead and held in inventory. For common requirements, deployment starts the day you order — no queue, no part hunt.

Domestic Manufacturing

Made in the USA and BABA-compliant. Building here removes the ocean freight, customs, and overseas backlog that stretch competitor lead times into months.

Vertical Integration

As a DEI Power Solutions company, we control the engineering, fabrication, and assembly in-house — so schedules aren’t hostage to a single outsourced bottleneck.

The Process

From Spec to Shipped, in Four Weeks

A clear, milestone-driven path with status you can track from order to delivery.

WEEK 0

Spec & Confirm

We finalize amperage, voltage, branch positions, SCCR, and enclosure type, then lock a confirmed ship date up front.

WEEK 1

Engineering Release

Drawings approved and the build released to the floor — with stocked components already on hand.

WEEKS 2–3

Build & Assemble

Domestic fabrication and assembly of your NX Series RPP, including any NX Intelligent BCMS branch-circuit monitoring.

WEEK 4

Test & Ship

UL-Listed, factory-tested, and shipped to site — ready to deploy with confidence.

NX Series RPP deployed in an active data center white space
Deploy With Confidence

When the Schedule Has Already Slipped

Projects move. A delayed switchgear delivery, a pulled-forward go-live, or a failed legacy panel can put power back on the critical path overnight. That’s exactly when our emergency and expedited options matter most.

Tell us the date you have to hit. We’ll pull from in-stock inventory, prioritize your build, and lay out the fastest realistic path to energized — with no surprises on what’s achievable.

  • Ship-from-stock for standard configurations
  • Expedited build prioritization for recovery timelines
  • Emergency support for outages and failed equipment
  • Honest, committed dates — no guesswork
Request Expedited Support
At a Glance

Lead Time by Scenario

Standard configurationsIn stock now — ships immediately
Build-to-spec NX Series RPP4-week standard lead time
NX Intelligent BCMS add-onConfigured within the standard build window
NX Switchgear (UL 891)Quoted per configuration — ask for current availability
Emergency / expeditedPrioritized recovery paths available on request
Country of manufactureMade in the USA — BABA-compliant

Have a date you need to hit? Let’s confirm it.

Get a Lead-Time Quote
Built for What’s Next

Fast Without Cutting Corners

Speed never comes at the expense of quality, components, or support.

UL-Listed

Every panel is factory-tested and UL-Listed before it ships — expedited builds meet the same standard as everything else we make.

Premium Components

A Siemens Approved OEM. In-stock supply means we never substitute to a lesser part just to make a date.

Scalable & Configurable

225A–600A, up to 84 branch positions, free-standing, wall-mounted, or back-to-back — configured to spec inside the standard window.

Predictable Dates

Confirmed ship dates locked at order, with transparent status so your construction schedule stays intact.

Rapid Deployment

In-stock plus domestic build compresses what the industry treats as a months-long wait into weeks.

Engineering Support

Real engineers help you spec the right configuration the first time — the fastest builds start with a clean, confirmed scope.

Tell Us Your Date. We’ll Build to It.

Next Gen Power Distribution, ready when your project is — in stock now, four weeks to spec, and expedited when it counts.

Start Your Project